January

Floor drain tank and drain water pit tank were produced and supplied for power unit №1 of Novovoronezh NPP-2.
The technical assignment drawn up, primary sampling system, a part of the Automated system for chemical control, was made and supplied.

February

The technical assignment drawn up, primary sampling system, a part of the Automated system for chemical control, was made and supplied for power unit №1 of Novovoronezh NPP-2.
Filter holders, detection assemblies which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.

March

Manufactured and supplied for measurement of volumetric activity of radioactive gases in the air from Automated radiation monitoring system for power unit No. 1 of Novovoronezh NPP-2.
Detecter devices, processing unit and transfering data, which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.
Modernization of Elevator equipment in axes 34-33, 35-36 at power unit No. 3 Smolensk NPP, including construction, installation and commissioning.
The technical assignment drawn up, primary sampling system, a part of the Automated sys-tem for chemical control, was made and supplied for power unit №1 of Novovoronezh NPP-2.

April

EPD readers, filter holders, protecting screen which are a part of the Automated system for radiation monitoring, were manufactured and supplied for power unit №1 of Novovoronezh NPP-2.

June

The technical assignment drawn up, primary sampling system sample preparation and measurement of the purge water makeup water 1 outline of the system of automated chemical control 1 circuit for unit No. 1 of Novovoronezh NPP-2.

Augustus

The kit calibration equipment of the system of automated chemical control 1 circuit was manufactured and supplied for unit No. 1 of Novovoronezh NPP-2.
Replacement of lifts at power units №2 and №3 of Smolensk NPP, including construction, installation and commissioning
The installation of the issuance of dosimeters of the system of automated chemical control 1 circuit were manufactured and supplied for unit No. 1 of Novovoronezh NPP-2.

December

Manufactured and supplied equipment for the issuance of dosimeters to BETA-480А and installing the issuance of dosimeters to BETA-100A from Automated radiation monitoring system for power unit No. 1 of Novovoronezh NPP-2
Conducted erection and commissioning of machinery equipment for Novovoronezh NPP-2
Manufactured and delivered manipulator MDR-3СЛ lightweight welding to PGV-1000 upgraded plugs of THE type AD-3ГЛ 001.17.001, manipulator MDO-1 for purging and drying the heat-exchange tubes of steam generators of the primary circuit for Rostov NPP
Manufactured and supplied the equipment for repair and maintenance of the neck of the reactor IRT units №1, 2 of the Belarusian NPP
Manufactured and supplied equipment the detection unit of BDAG of composition avtomatizirovanno radiation monitoring system for Novovoronezh NPP-2
Manufactured and supplied equipment of automated control system is the Controlling point of the input/output of digital signals for power unit №1 of Novovoronezh NPP-2
Construction, installation and commissioning works were performed on the event "Modernization of cargo and passenger elevators" at the power unit №3 of Balakovo NPP.